About ECOpyrolysis
ECOpyrolysis designs and builds pyrolysis and distillation equipment for plastic, tyre and oil sludge. One engineering team carries the file from the first feedstock question to the day the line produces oil you can sell.
This page is about how we work and how we quote. Capacities, feedstock limits and process detail sit on the product pages.
Four equipment lines, one engineering team
Each line is configured around the material you actually have. Reactor, condenser train and discharge system are designed together, so the interfaces between stages do not fall between two suppliers.
If your material is a mix, or sits at the edge of what the process handles, say so in the first message — that changes the design more than the tonnage does.
How we work with overseas buyers
Most of the risk in a pyrolysis project sits in the gaps between supplier, installer and operator. These four practices exist to close them.
One engineer owns your file
The proposal is a technical document
Inspection is recorded, not promised
Commissioning is priced, not implied
Three decisions that set your oil output
Buyers usually compare reactor volume and price. The output difference between two lines of the same size almost always comes from these three areas.
Reactor and heating design
Indirect heating, residence time and the internal structure of the reactor decide how completely the polymer cracks. An undersized reactor shows up later as heavy residue and short run campaigns.
Condenser train
Staged cooling separates light and heavy fractions. Condensers sized for a smaller line send oil vapour to the burner, and that loss never appears on the specification sheet.
Discharge and emission control
Carbon black discharge and flue gas treatment are where plants fail inspection. Both are designed into the line, not bolted on after the first site visit.
What is in a technical offer
A quotation that lists only a price and a capacity cannot be compared with another one. Ours is built to be checked line by line — including the assumptions we used.
Send the material, the target tonnage and the site conditions; the first response is a sizing basis, not a brochure.
| Capacity basis | Tonnes per day, batch or continuous, stated at the feed moisture and bulk density you gave us. |
|---|---|
| Feedstock specification | Accepted material, maximum particle size, moisture and contamination limits. |
| Output estimate | Oil, carbon black and gas ranges for that feedstock — with the assumptions written next to them. |
| Utilities | Power, water, fuel and labour per tonne of feed. |
| Layout and civil works | Footprint, foundation loads, crane and truck access. |
| Commercial scope | What we supply, what you supply locally, delivery terms and payment milestones. |
Where we say no
Three limits we would rather state on this page than discover together after the contract is signed.
Material we will not quote for
Capacity we cannot hold
References we do not publish
What buyers ask before they commit
If your question is not here, send it directly — technical questions get a technical answer.
All three. The reactor, discharge and emission stages differ; the chemistry does not. Tell us the material and we will point you to the line that matches it.
Yes — from your tonnage and a description of the material. The proposal states that assumption openly, and a sample test confirms it before the design is frozen.
Feedstock type and rough composition, target tonnes per day, site country, available power and whether you need a batch or continuous line. Four lines of text are enough to start.
Approval drawings, fabrication with photo records, pre-shipment inspection, shipping documents, then installation supervision and operator training on site.
Tell us what you are processing
Send the material, the tonnage and the site. You will get a sizing basis and the assumptions behind it — in writing.