ECOpyrolysis designs and builds pyrolysis and distillation equipment for plastic, tyre and oil sludge. One engineering team carries the file from the first feedstock question to the day the line produces oil you can sell.

This page is about how we work and how we quote. Capacities, feedstock limits and process detail sit on the product pages.

WHAT WE BUILD

Four equipment lines, one engineering team

Each line is configured around the material you actually have. Reactor, condenser train and discharge system are designed together, so the interfaces between stages do not fall between two suppliers.

If your material is a mix, or sits at the edge of what the process handles, say so in the first message — that changes the design more than the tonnage does.

PP, PE and PS waste into fuel oil, carbon black and combustible gas. Batch to continuous, 1–30 TPD.
Whole or shredded tyres, with steel and fibre handling designed into the reactor and discharge.
Oily sludge and tank bottom waste, with pre-treatment for water content and solids.
Pyrolysis oil and used lubricants refined into reusable base oil.
HOW WE WORK

How we work with overseas buyers

Most of the risk in a pyrolysis project sits in the gaps between supplier, installer and operator. These four practices exist to close them.

One engineer owns your file

The person who answers your first email is the person who signs off the drawings. You are not handed between a sales queue and an unnamed technical department.

The proposal is a technical document

Capacity basis, feedstock limits, utility consumption, layout drawing, scope split and payment terms are written down before you are asked to compare prices.

Inspection is recorded, not promised

Dimensional checks, weld inspection and a trial run are photographed and sent to you before the equipment leaves the workshop.

Commissioning is priced, not implied

Installation supervision, operator training and a start-up report are quoted as line items, so you know what is included and what you organise locally.
ENGINEERING

Three decisions that set your oil output

Buyers usually compare reactor volume and price. The output difference between two lines of the same size almost always comes from these three areas.

Reactor and heating design

Indirect heating, residence time and the internal structure of the reactor decide how completely the polymer cracks. An undersized reactor shows up later as heavy residue and short run campaigns.

Condenser train

Staged cooling separates light and heavy fractions. Condensers sized for a smaller line send oil vapour to the burner, and that loss never appears on the specification sheet.

Discharge and emission control

Carbon black discharge and flue gas treatment are where plants fail inspection. Both are designed into the line, not bolted on after the first site visit.

WHAT YOU RECEIVE

What is in a technical offer

A quotation that lists only a price and a capacity cannot be compared with another one. Ours is built to be checked line by line — including the assumptions we used.

Send the material, the target tonnage and the site conditions; the first response is a sizing basis, not a brochure.

Capacity basisTonnes per day, batch or continuous, stated at the feed moisture and bulk density you gave us.
Feedstock specificationAccepted material, maximum particle size, moisture and contamination limits.
Output estimateOil, carbon black and gas ranges for that feedstock — with the assumptions written next to them.
UtilitiesPower, water, fuel and labour per tonne of feed.
Layout and civil worksFootprint, foundation loads, crane and truck access.
Commercial scopeWhat we supply, what you supply locally, delivery terms and payment milestones.
BOUNDARIES

Where we say no

Three limits we would rather state on this page than discover together after the contract is signed.

Material we will not quote for

PVC, PET-heavy streams and halogenated waste damage the reactor or the oil quality. We will tell you at the enquiry stage rather than after the deposit.

Capacity we cannot hold

If your tonnage does not fit the reactor size, you get a smaller or larger configuration — not a number that reads well in a spreadsheet.

References we do not publish

Customer names, sites and photographs are shared with their permission only. Ask, and we will request it for your region.
QUESTIONS

What buyers ask before they commit

If your question is not here, send it directly — technical questions get a technical answer.

All three. The reactor, discharge and emission stages differ; the chemistry does not. Tell us the material and we will point you to the line that matches it.

Yes — from your tonnage and a description of the material. The proposal states that assumption openly, and a sample test confirms it before the design is frozen.

Feedstock type and rough composition, target tonnes per day, site country, available power and whether you need a batch or continuous line. Four lines of text are enough to start.

Approval drawings, fabrication with photo records, pre-shipment inspection, shipping documents, then installation supervision and operator training on site.

NEXT STEP

Tell us what you are processing

Send the material, the tonnage and the site. You will get a sizing basis and the assumptions behind it — in writing.